Cedar Creek Trunk-Winterset Woods & Sterling Hills

Cedar Creek Trunk-Winterset Woods & Sterling Hills

Last Updated

07/21/2010

Project Category:

Water Utilities-Sewer

Project Contact:

David Lohe
816-969-1814

Estimated Construction Dates:

Feb 01, 2014 - Aug 01, 2014

Project Status

Future

Projected Funding:

$565,000

Project Description:

This sanitary sewer improvement project consists of the construction of 2,600 LF of sanitary sewer relief lines ranging in pipe size from 12-inches to 15-inches in diameter on the lower segments of the Cedar Creek Interceptor Subbasins CC-03 and CC-04.

Project Rationale:

The existing lines do not have capacity to convey the predicted peak wet weather sanitary sewer flows nor meet the future needs of development. The condition of the existing pipe system is also a concern. There has been at least one documented overflow in these subbasins.

Status Details: