Water Main Rehab - FY2012

Water Main Rehab - FY2012

Last Updated

07/23/2010

Project Category:

Water Utilities-Water

Project Contact:

David Lohe
816-969-1814

Estimated Construction Dates:

-

Project Status

Future

Projected Funding:

$1,067,000

Project Description:

This project involves rehabilitation of 7,900 lf of 6 and 8-inch existing waterlines in mutliple locations in the city. Specific locations include Lakeview and Madison Streets south of 3rd Street; Independence Ave. between 3rd and Swann Road; and 3rd St. from Independence to Grand.

Project Rationale:

The existing mains have had numerous breaks due to corrosion of existing pipes, resulting in service outages and high repair costs in these areas.

Status Details: