Water Main Rehab - FY2011

Water Main Rehab - FY2011

Last Updated

07/23/2010

Project Category:

Water Utilities-Water

Project Contact:

Donna Mosley
816-969-1809

Estimated Construction Dates:

Aug 10, 2011 - Dec 10, 2011

Project Status

Future

Projected Funding:

$2,179,000

Project Description:

This project involves replacement or rehabilitation of 22,600 lf of existing 4, 6 and 8-inch waterlines in multiple locations in the city. Specific locations include S. Lea at 6th and 7th; Highland and adjacent streets north of Persels; the Raintree development (Royale, Reef Point, Averio); Lorman and Elwood; Donovan and Carroll; and Cambridge west of Independence.

Project Rationale:

The existing mains have had numerous breaks due to corrosion of existing pipes, resulting in service outages and high repair costs in these areas.