M150 & Doc Henry Water Replacement
M150 & Doc Henry Water Replacement
Last Updated
07/23/2010
Project Category:
Water Utilities-Water
Project Contact:
Donna Mosley
816-969-1809
Estimated Construction Dates:
Dec 13, 2010 - Aug 01, 2011
Project Status
In Design
Projected Funding:
$519,000
Project Description:
This project involves the replacement of 3,800 feet of existing 16" and 12" with a new 12" water main along M150 Highway east of M291 Highway to Doc Henry Road and south along Doc Henry Road. This project will be bid in conjunction with the US50 & Harris Road Phase I Water Replacement project.
Project Rationale:
The existing water main has been repaired numerous times. Soils in the area are corrosive so HDPE or PVC pipe materials are being considered for the project.
Status Details:
Project is currently in the design phase and will bid fall 2010.



