Airport Preliminary Engineering

Airport Preliminary Engineering

Last Updated

08/18/2009

Project Category:

Airport

Project Contact:

John Barker
816-969-1850

Estimated Construction Dates:

Apr 01, 2004 - Sep 30, 2007

Project Status

N/A

Projected Funding:

$577,000

Project Description:

This project includes thirty percent engineering design, drawings, and estimates for the development of the airport as depicted in the Master Plan adopted in March, 2000.

Project Rationale:

This project is needed in order to provide engineered design and estimates to verify previous cost estimates.

Status Details:

Crawford Murphy and Tilley is the consultant and has submitted the drawings and report to finalize the 30 percent engineering.