Obtain project details by selecting the desired project on the map, or review a list of unmapped projects from the link above.
08/18/2009
John Barker
816-969-1850
Jun 01, 2005 - Jun 30, 2010
N/A
$18,200,000
This project involves the purchase of properties adjacent to the Lee's Summit Municipal Airport as shown on the Airport Layout Plan approved in March 2000.
This land acquisition is required in order to provide Runway Protection Zones RPZ's)for the extension of Runway 18/36; to provide RPZ's for both ends of Runway 11-29; and to provide development area for the construction of a new terminal and new hangars to replace the existing hangars that will be demolished to meet FAA airport design standards.
The process of land acquisition includes surveys, appraisals, Environmental Site Assessments, and negotiations. The process is underway for all of the properties involved. The City has acquired thirteen of the tracts and has one offer pending.
The surveyor and appraiser have completed all of the surveys and appraisals for the remaining tracts.
The land acquisition program for the airport is on hold pending the outcome of the Airport Business Plan.
08/18/2009
John Barker
816-969-1850
Apr 01, 2004 - Sep 30, 2007
N/A
$577,000
This project includes thirty percent engineering design, drawings, and estimates for the development of the airport as depicted in the Master Plan adopted in March, 2000.
This project is needed in order to provide engineered design and estimates to verify previous cost estimates.
Crawford Murphy and Tilley is the consultant and has submitted the drawings and report to finalize the 30 percent engineering.
03/22/2010
John Barker
816-969-1850
Jun 03, 2008 - Jun 01, 2010
In Construction
$6,500,000
This Project began on June 3, 2008. The project consisted of the development of a new parallel taxiway on the East side of the Airport and an aircraft parking apron area. Also included were installation of wildlife fencing, clearing of obstructions in the runway protection area, and the remarking of both runways. The work was performed by Emery Sapp & Sons.
The Masterplan for the airport includes upgrading the airport to a C-II airport. The west parallel taxiway is too close to the north-south runway (R/W 18-36) to meet the C-II standards. A new terminal area needs to be developed on the east side of R/W 18-36 before the existing terminal and some hangars can be removed, allowing the relocation of the west parallel taxiway.
With the exception of final seeding in some areas, this project is complete. Seeding will be performed within the specified dates for seeding in the spring of 2010.